Jiangsu Zhangjiagang Project


1x2097m³

It meets the load‑bearing requirements of the central agitator in the vessel; the gas phase zone at the top is constructed from 316L stainless steel, while the liquid phase zone is made of carbon steel with anti‑corrosion treatment. It includes a platform with access ladder and walkway, a lightning protection system, and internal piping.

Previous page:

视频标题